How long does a roof replacement take?

5 Things That Decide How Long a Roof Replacement Takes

Most residential roof replacements in Darwin take around 3 to 7 working days once the materials are on site. These five factors decide where your job lands in that range.

The 5 things that decide it

  1. Roof size and shape. Larger homes and complex rooflines with many hips and valleys take longer.
  2. Material. Tile roofs generally take longer than Colorbond.
  3. Weather. Wet season storms and rain delays can stop work for days.
  4. Material supply. Custom colours or profiles can take weeks to arrive.
  5. What is under the old roof. Asbestos needs special handling, and rotten timber or batten repairs add time once the old roof is off.

The job, step by step

  1. Quote and booking
  2. Materials ordered and delivered
  3. Old roof stripped
  4. New roof installed
  5. Gutters, flashings and clean up

Planning ahead

The dry season is the busiest time for roofers, so book early. Look for a roofer who gives you a clear start date and keeps you updated during the job.

Frequently asked questions

Do I need to move out during a reroof?

Usually not, but expect noise and some disruption.

Can the roof be left open overnight?

A good roofer protects the home and covers any exposed areas at the end of each day.