How long does a roof replacement take?
5 Things That Decide How Long a Roof Replacement Takes
Most residential roof replacements in Darwin take around 3 to 7 working days once the materials are on site. These five factors decide where your job lands in that range.
The 5 things that decide it
- Roof size and shape. Larger homes and complex rooflines with many hips and valleys take longer.
- Material. Tile roofs generally take longer than Colorbond.
- Weather. Wet season storms and rain delays can stop work for days.
- Material supply. Custom colours or profiles can take weeks to arrive.
- What is under the old roof. Asbestos needs special handling, and rotten timber or batten repairs add time once the old roof is off.
The job, step by step
- Quote and booking
- Materials ordered and delivered
- Old roof stripped
- New roof installed
- Gutters, flashings and clean up
Planning ahead
The dry season is the busiest time for roofers, so book early. Look for a roofer who gives you a clear start date and keeps you updated during the job.
Frequently asked questions
Do I need to move out during a reroof?
Usually not, but expect noise and some disruption.
Can the roof be left open overnight?
A good roofer protects the home and covers any exposed areas at the end of each day.